Free Engineering Workbench calculator

Dilution and ore loss

Waste mixed into ore and ore left behind.

Open Dilution and ore loss in the live, interactive calculator — type your numbers, see the result instantly.

Open live calculator →
Mining

How it's worked out

  • Dilution = waste in mined ore ÷ mined ore. Ore loss = (planned − recovered) ÷ planned
  • Reliable tonnage reconciliation
NoteBoth lower the grade or the metal won. Reconcile mine, stockpile and plant figures regularly.

Need help acting on this number?

VVnT SeQuor's our services practice helps teams turn this metric into a plan.

Talk to us →

Related calculators